Customization: | Available |
---|---|
After-sales Service: | Online |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
(1) Push-type,independent power, light and practical.
(2)The thermal efficiency is increased by 2 to 3 times ,shortening the entire working time.
Model | LS-200 bitumen heating |
Generator | Honda 200 |
Crack sealing pressure | 2Mpa |
Volts | 220V |
power | 2.8KW |
Speed | 3600r/min |
Output speed | 8-15L/min |
The length of electric heating tube | 7m |
Stirring Method | Electric stirring |
Hot melt kettle volume | 200L |
Moving method | Hand push or pull |
Combustor | Ltalian Riello 445T1 combustor |
Temperature control system | Automatic control by SLA-5000 intelligent digital temperature controller |
Heating method | Conduction oil indirect heating and extemal oil pump circulating heating |
Filling material heating time | About 30 minutes |
Temperature range | 0-280ºC |
Size | 2400*1250*1550mm |
Weight | 515kg |
1. Q: Are you trading company or manufacturer?
A: We are original equipment manufacturer.
2. Q: How long is your delivery time?
A: It is according to the model and quantity.
Generally it is 3-5 days if the machines are in stock.
It will be 15-30 days if you want to customize the machines.
3. Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer you the sample machine.
It's not free. Customers should charge the freight cost of express or delivery .
4. Q: What is your payment terms ?
A: We accept T/T, Western Union, Money Gram, Paypal etc.
Deposit percent can be negotiate relying on your amount